Ski Resorts News
04/03/2018
An example of the new Grangettes gondola cabin that will be used on the replacement gondola from Courchevel Village 1550 to 1850.
The gondola cabin is a new model from the manufacturer POMA called “EVO”. It is a 10 seater cabin with an interior height of 2.10 m that allows you to stand up and has indoor and outdoor lighting for nighttime operation. The departure station will allow you to board directly into the cabins without going through a ramp or a staircase (same as Ariondaz).
Work will begin on April 23 for commissioning in early December 2018.
Major integration work is expected at the level of the Croisette with a small deviation of the road in order to be able to build the top station. New pylons will be dropped in by a Super Cougar helicopter during September. A mid-station to receive passengers from a new gondola down towards Aquamotion is also planned. An example of the new cabin is on display near the Verdons base station.

Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026